Installing a Sunology station on a roof is an excellent solution for optimizing solar energy production. However, this installation depends on several factors: the type of roofing, the slope, and the appropriate fixings. Discover how to correctly install your Sunology station and avoid common mistakes.

πŸ‘‰ Order on Sunology.eu


πŸ’‘ Installation on a tiled or slate roof

βœ”οΈ Flat roof or slope less than 5Β°
If your roof is almost flat (less than 5Β° of slope), you can install the Sunology station using a ballasting system. This allows for a simple and no-fix installation while ensuring the stability of the panel.

⚠️ Slope greater than 5°
When the inclination exceeds 5Β°, even with ballasting, the panel may slip, especially in heavy rain or high winds. In this case, a specific fixing is recommended to ensure good adherence.

Sunology installation on sloped roof

πŸ”© Fixing on a steel tray roof or pergola

βœ”οΈ Two possible options:

  • Ballasting the Sunology station for a temporary installation or without drilling.
  • Wall fixing with a specific kit to ensure optimal support.

βœ”οΈ Slope between 5Β° and 30Β°
If your steel tray roof or pergola has a moderate slope (up to 30Β°), it is essential to use a wall fixing kit to ensure the stability of the panel.

πŸ”§ Installation on steel tray

  • The 4 fixings must be positioned on the peak of the steel tray’s wave to prevent sagging.
  • Use suitable screws (not provided) available at hardware stores to ensure a solid and durable fixing.
Fixing on steel tray

🏑 Installing a Sunology station on a garden shed

If you want to fix your Sunology station on a garden shed, you must screw the kit’s attachments directly onto the frame (rafters).
⚠️ Important precautions:

  • Ensure that the covering remains waterproof (shingle, bitumen membrane, etc.).
  • Securely fasten the station to avoid any risk of being lifted by the wind.

πŸ“œ Regulations: Is declaration at the town hall mandatory?

🚨 Any installation higher than 1.80 m must be declared at the town hall.

If your roof is more than 1.80 m above the ground, a prior declaration of work is mandatory. Before starting your installation, check with your town hall to avoid any administrative constraints.


πŸ”— Order your Sunology station now!

Ready to switch to solar energy? Order your Sunology station and accessories today for an easy and quick installation.

πŸ‘‰ Order on Sunology.eu


πŸ“Œ In summary: key points

βœ… Installation possible on flat or low slope roof (≀5Β°) with ballasting.
βœ… Fixing essential for slopes greater than 5Β° and up to 30Β°.
βœ… Steel tray roof or pergola: wall fixing recommended.
βœ… Declaration at the town hall mandatory if the height exceeds 1.80 m.

⚑ Switch to solar energy today and enjoy a simple and effective solution to reduce your electricity bill! πŸ’‘β˜€οΈ

For further reading:

Sunology Reviews: What Users Really Think After Several Months

Sunology Promo Code: Reduce Your Electricity Bill Thanks to Solar Energy!